100% Free AACE Certification AACE-PSP Dumps PDF Demo Cert Guide Cover [Q27-Q46]

Share

100% Free AACE Certification AACE-PSP Dumps PDF Demo Cert Guide Cover

PDF Exam Material 2023 Realistic AACE-PSP Dumps Questions


Earning the AACE-PSP certification can be a valuable asset for professionals in the planning and scheduling field. It demonstrates a commitment to professional development and a dedication to mastering the skills and knowledge required for success in this field. Additionally, many employers look for this certification as a measure of competency when hiring or promoting professionals in the planning and scheduling field.


AACE International AACE-PSP (Planning & Scheduling Professional (PSP)) Exam is a globally recognized certification for professionals who are responsible for planning and scheduling in various industries. Planning & Scheduling Professional (PSP) Exam certification is offered by AACE International, a professional association that provides education, certification, and networking opportunities to project control professionals. The AACE-PSP certification evaluates the knowledge, skills, and abilities of candidates in planning, scheduling, and controlling projects.

 

NEW QUESTION # 27
Identify the minimum project duration.

  • A. 20 months.
  • B. 16 months.
  • C. 21 months.
  • D. 19 months.

Answer: A


NEW QUESTION # 28
What is the result of a forward pass calculation?

  • A. Value of free float for individual activities
  • B. Critical path
  • C. Value of total float for individual activities
  • D. Early start and early finish date for individual activities

Answer: D


NEW QUESTION # 29
What is the workweek period for this project?

  • A. Monday through Friday
  • B. Monday through Saturday
  • C. Sunday through Friday
  • D. Sunday through Saturday

Answer: D


NEW QUESTION # 30
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

  • A. 5 lifts
  • B. 80 lifts
  • C. 50 lifts
  • D. 20 lifts

Answer: C


NEW QUESTION # 31
Which statement is true?

  • A. Where compensability can be established, excusabltity cannot be assumed.
  • B. Where compensability cannot be established, excusability is a given.
  • C. Where compensability cannot be established, excusability is assumed.
  • D. Where compensability can be established, excusability is assumed.

Answer: C


NEW QUESTION # 32
At a minimum, periodic reporting must be done at what interval?

  • A. Monthly.
  • B. As specified in the contract documents.
  • C. As requested by the owner.
  • D. As requested by the project manager.

Answer: B


NEW QUESTION # 33
If the administrative constraints for developing the precedence diagram, as provided in the contract documents, indicate that no individual construction activities shall have a longer duration of two months, how many activities in the "normal" schedule would be affected?

  • A. Cannot be determined.
  • B. 14.
  • C. 13.
  • D. 12.

Answer: D


NEW QUESTION # 34
In the "normal" schedule, excluding Activity 1000, what activity(s) are concurrent with Activity 3001?

  • A. 4001 and 5001.
  • B. 2004.
  • C. 2003 and 7001.
  • D. 4001, 5001 and 6001.

Answer: A


NEW QUESTION # 35
There is only enough room for a maximum of 4 cranes to be placed on-site. Assuming that a single crane can perform 35 lifts per day and that a column pour requires 60 lifts, what is the minimum number of tower cranes that should be used for the above described column pours?

  • A. 2 cranes
  • B. 3 cranes
  • C. 4 cranes
  • D. 1 crane

Answer: A


NEW QUESTION # 36
During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?

  • A. Expedite packaging by 5 days.
  • B. Expedite printing by 5 days.
  • C. Delay product release by 5 days.
  • D. Delay manufacturing by 5 days.

Answer: C


NEW QUESTION # 37
Activity C is a

  • A. 1-day activity.
  • B. Contentious activity.
  • C. Milestone.
  • D. Continuous activity.

Answer: C


NEW QUESTION # 38
What is the cycle time?

  • A. 17 minutes
  • B. 5 minutes
  • C. 6 minutes
  • D. 14 minutes

Answer: A


NEW QUESTION # 39
How much Total Float does drafting the product manual have?

  • A. 10 workdays.
  • B. 5 workdays.
  • C. 0 workdays.
  • D. 15 workdays.

Answer: A


NEW QUESTION # 40
Constraints control events or activities that __________________.

  • A. Affect only the forward pass.
  • B. Affect only the backward pass.
  • C. Are not based on project relationships.
  • D. May be over-ridden by activity logic.

Answer: D


NEW QUESTION # 41
Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT

  • A. Divide activities into smaller activities. This will increase activity detail and duration estimate accuracy.
  • B. Look at each activity independently and don't follow specific logic paths when assigning activity durations.
  • C. Use the people responsible for performing the work as a resource to assign activity durations.
  • D. Use gross building square footages. The pluses and minuses all average out.

Answer: D


NEW QUESTION # 42
Which of the following is NOT required when performing weekly or monthly schedule updates?

  • A. Actual finish of activities.
  • B. Remaining duration of activities.
  • C. Original duration of activities.
  • D. Percent complete.

Answer: B


NEW QUESTION # 43
What is the free float for Activity F?

  • A. 1months.
  • B. 0months.
  • C. 3 months.
  • D. 2month.

Answer: B


NEW QUESTION # 44
Which of the following documents is most likely to be of the LEAST value to a planner/scheduler when planning a contractor's baseline critical path schedule for the construction of a large high-clearance bridge located very near an airport? The contractor has been awarded the contract.

  • A. The regulations published by the government aviation agency
  • B. The project plans and specifications
  • C. The project geotechnical report
  • D. The government's report on future high-clearance bridge projects

Answer: D


NEW QUESTION # 45
Which of the following phases does NOT describe the commonly accepted construction life cycle?

  • A. Installation phase.
  • B. Turnover and start-up phase.
  • C. Planning and design phase.
  • D. Claims and disputes phase.

Answer: C


NEW QUESTION # 46
......


AACE International is a renowned professional association that provides certification programs for project and cost management professionals. The AACE-PSP (Planning & Scheduling Professional) Exam is one of their most popular certification programs. AACE-PSP exam is designed to test the proficiency of individuals in the field of project planning and scheduling. It is an ideal certification for professionals who wish to demonstrate their knowledge and expertise in project management.

 

Updated AACE International AACE-PSP Dumps – PDF & Online Engine: https://www.actual4cert.com/AACE-PSP-real-questions.html

AACE-PSP.pdf - Questions Answers PDF Sample Questions Reliable: https://drive.google.com/open?id=1JCP2-H6_kLPAIpEVHQV38ylCFJgu1TRC