
[Dec 25, 2021] C-TS422-1909 Exam Dumps - SAP Practice Test Questions
New Real C-TS422-1909 Exam Dumps Questions
NEW QUESTION 21
Which options are available for an SAP S/4HANA deployment?
There are 2 correct answers to this question.
Response:
- A. SAP S/4HANA on premise
- B. SAP S/4AHANA Enterprise Management cloud
- C. SAP S/4HANA private cloud
- D. SAP S/4HANA Professional services cloud
Answer: A,C
NEW QUESTION 22
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Wait
- B. Full
- C. In use
- D. Empty
Answer: B
NEW QUESTION 23
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A. Create object selection variant for product-related alerts.
- B. Create object selection variant for transportation lane-related alerts.
- C. Assign the overall profile to the authorization profile.
- D. Create object selection variant for resource-related alerts
- E. Assign the alert profile to the overall profile.
Answer: A,D,E
NEW QUESTION 24
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the minimum order quantity.
- B. Use the MRP type for vendor managed inventory.
- C. Use the reorder point.
- D. Use the fixed lot size procedure.
Answer: D
NEW QUESTION 25
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Quota arrangements
- B. Special procurement keys
- C. Production versions
- D. Outline agreement
- E. Purchasing info records
Answer: B,D,E
NEW QUESTION 26
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.
- A. Predefined GMP compliant process order types to meet audit requirements
- B. Documentation of quality data with Quality Management
- C. Recipe approval (with Engineering Change Management)
- D. Use of the digital signature function to check and run business processes
- E. Use of the GMP compliant flag in relevant master data applications
Answer: B,C,D
NEW QUESTION 27
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. Net requirements calculation
- B. Lot size calculation
- C. Source determination
- D. BOM explosion
Answer: A
NEW QUESTION 28
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a planning group.
- B. Use a propagation range.
- C. Use a resource group.
- D. Use a heuristic.
Answer: D
NEW QUESTION 29
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:
- A. Filters
- B. Sort
- C. Forecast
- D. Scheduling
- E. Drilldown
Answer: A,B,E
NEW QUESTION 30
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:
- A. Default unit of measure
- B. Default values for the item status
- C. Allowed material type
- D. Maximum allowed low-level code
Answer: C
NEW QUESTION 31
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Engineering change management
- B. Planning
- C. Implementation
- D. Inspection during production
Answer: B,C
NEW QUESTION 32
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the item category of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the special procurement key of the phantom assembly in the BOM.
- D. Change the explosion type of the phantom assembly in the BOM.
Answer: D
NEW QUESTION 33
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Checking rule and group must be assigned.
- C. Indicator Relevant for finite scheduling must be set.
- D. PRT Availability check must be set.
Answer: A,C
NEW QUESTION 34
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The cross-plant status
- B. The least restrictive status
- C. The most restrictive status
- D. The plant-specific status
Answer: C
NEW QUESTION 35
Which material master setting is required to use the repetitive planning table for production with production orders?
Please choose the correct answer.
Response:
- A. A repetitive manufacturing profile must be assigned on the MRP4 view
- B. An overall profile be assigned on the Work Scheduling view
- C. The Selection Method must be set to "2 Selection by production version".
- D. At least one valid production version must exist on the MRP4 view
Answer: A
NEW QUESTION 36
......
SAP C-TS422-1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
Pass Your C-TS422-1909 Exam Easily with Accurate PDF Questions: https://www.actual4cert.com/C-TS422-1909-real-questions.html