Updated Jan-2024 100% Cover Real ATM Exam Questions Make Sure You 100% Pass [Q34-Q55]

Share

Updated Jan-2024 100% Cover Real ATM Exam Questions Make Sure You 100% Pass

ATM dumps Accurate Questions and Answers with Free and Fast Updates


ISTQB ATM (ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]) Exam is a globally recognized certification aimed at establishing a comprehensive understanding of testing principles, practices, and methods at an advanced level. To enhance the career prospects of testing professionals, the certification is designed to provide individuals with the knowledge and skills required to manage complex testing projects.


Is There a Difference Between the Foundation Certificate and the Advanced Certificates?

The foundation certificate can be obtained after passing both parts of the ISTQB certification process. This certificate is an international standard that shows your level of expertise in software testing. This certificate can be obtained after three months to one year. To obtain the Advanced Certificate, you must pass all parts of the ISTQB certification process.

Shopping carts, email servers, and payment handling are all examples of testing that can be performed on software. Disguise, intrusion, and introduction are all vital ideas that are covered in the ISTQB certification. By passing this examination, you can receive another set of certification. Attention to detail and a strong knowledge of software and its functions is essential to the testing process. Figure out what software testing actually involves and how your tests can improve security processes. Work as a tester for a large organization and protect the web from malicious attacks by learning more about testing.

Handheld scanners are used to test software from a mobile device. These devices can be used to test smartphones, tablets, or laptops. The purpose of a handheld scanner is to test software on a low-cost device similar to a personal computer. Plan your software testing needs by overlaying a test cycle. Software testing cannot be rushed. Caught by a cyber attacker who uses a flaw in the software to spy on the user. Always look for potential problems and unexpected scenarios. Articles, presentations, and training all play a part in the software testing process. Every test has a different purpose when it is being performed which are all included in ISTQB ATM Dumps. Category: Cyberattacks that are exploited by malicious users. EMV cards and chip cards are tested using a handheld scanner. Testing options need to be kept up-to-date so that new code can be tested.

 

NEW QUESTION # 34
You are the Test Manager for a project to develop a client-server application that allows
wine vendors to order custom-assorted packages of wines of several winemakers to sell
special packages in their wine shops.
You decide to apply a blended risk-based and reactive testing strategy. Below the exit
criteria for the system testinG.
EXCR1- Each "critical" quality risk item must be covered by at least one test condition
EXCR2- Each "critical" requirement must be covered by at least one test condition
The following are the "critical" requirements of the application:
REQ-SEL-1. The application shall allow the user to order only one package at a time
REQ-SEL-2. The application shall allow the user to select between four different packages
(2-bottles, 6-bottles, 12-bottles, 15-bottles)
REQ-SEL-3. The application shall allow the user to order a package containing at least 1
bottle and no more bottles than the package size. No error messages shall be displayed if
the user selects a valid number of bottles (at least 1 bottle and no more than the package
size)
REQ-SEL-4. The application shall display an error message "Invalid number of bottles" if
an invalid number of bottles is selected by the user (zero bottles or a number higher than
the package size)
REQ-PAY-1. The application shall allow the user to pay with the three accepted credit
cards (Visa, MasterCard, American Express)
REQ-PAY-2. The application shall display an error message "Invalid credit card" if invalid
credit card data are given by the user
QUSTION NO: 11
The following is the unique "critical" quality risk item that has been identified:
CR-RSK-1. The GUI of the application might accept non-integer values for the input field
designed to get the number of bottles from the user
Test analysis for system testing has just begun and the following test conditions have been
identifieD.
TC-SEL-2. Test the selection of the package sizes
TC-SEL-4. Test wrong numbers of bottles for an order
TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of
bottles from the user
Assume that you have used traceability to determine the logical test cases that cover all the
requirements and the single risk item identified in that scenario.
Which of the following is a positive logical test that is complete and correct, and covers the
REQ-SEL-4 requirement?
K3 2 credits

  • A. Select a 6-bottles package, then try to insert 7 bottles
  • B. Select a 6-bottles package, then try to insert 7 bottles; verify that no error messages are
    displayed
  • C. Select a 6-bottles package, then try to insert 7 bottles; verify that the "Invalid number of
    bottles" message is displayed
  • D. Select a 6-bottles package, then try to insert 5 bottles; verify that no error messages are
    displayed

Answer: C


NEW QUESTION # 35
You are the Test Manager on a project following an iterative life-cycle model. The project
should consist of nine iterations of one month duration each. It is planned to develop the
most important features to have a stable core of the application in the first three iterations
and to add the additional features in the last six iterations.
At the beginning of the first iteration, only a draft version of the requirements specification
document for the core features is available. Assume that during each of the first three
iterations, the chosen features are fully completed and unit tested.
Which of the following statements is true in this context?
K4 3 credits

  • A. You should allocate a large effort for system testing during the first three iterations
  • B. You should allocate all the effort for the system test phase only in the last iteration
  • C. The system test phase should start when all the requirements are frozen
  • D. You should apply the same test strategy as used in a sequential life cycle model

Answer: A


NEW QUESTION # 36
Which of the following would you expect to be most likely an example of a demotivating
factor for testers?
K2 1 credit

  • A. The management asks the testers to be kept informed about the intensity, quality and
    results of testing
  • B. The testers' recommendations to improve the system or its testability are adopted by the
    development team
  • C. Test quality is measured by counting the number of customer/user reported problems.
  • D. The testers are assessed on whether and how often they detect important and critical
    failures
  • E. The same regressions tests are manually executed by the same testers, for every
    product release, without regression test tools

Answer: C,E


NEW QUESTION # 37
Assume you are working on a defect management process to be used by a software organization to track the current status of the defects reports for several projects.
When a defect is found for investigation a defect report is created in "Opened" state that is the unique initial state. The defect report status has also a unique finale state that is the "Closed" state.
The following state transition diagram describes the states of this defect management process:
Where only the initial ("Opened") and final ("Closed") states are indicated while the remaining states (V, W, X, Y, Z) have yet to be named.

Which of the following assignments would you expect to best complete the defect management process?

  • A. V=Rejected , W=Corrected , X=Validated, Y=Re-Opened, Z=Assigned
  • B. V= Corrected, W=Assigned, X=Validated, Y=Corrected, Z=Rejected
  • C. V=Assigned, W=Corrected , X=Validated, Y=Re-Opened, Z=Rejected
  • D. V=Assigned, W=Validated , X=Corrected, Y=Re-Opened, Z=Rejected

Answer: C

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 38
Assume you are a Test Manager involved in system testing of a CRM application for a Pay-
TV company. Currently the application is able to support a proper number of users assuring
the required responsiveness. Since the business is expected to grow, you have been
asked to evaluate the ability of the application to grow to support more users while
maintaining the same responsiveness.
Which of the following tools would you expect to be the most useful at performing this
evaluation?
K2 1 credit

  • A. Static analysis tools
  • B. Test management tools
  • C. Coverage tools
  • D. Performance tools

Answer: D


NEW QUESTION # 39
The following are the exit criteria described in the test plan of a software product:
EX1. The test suite for the product must ensure that at least each quality risk item is covered by at least one test case (a quality risk item can be covered by more test cases).
EX2. All test cases in the test suite must be run during the execution phase.
EX3. Defects are classified into two categories: "C" (critical defect) and "NC" (non-critical defect). No known C defects shall exist in the product at the end of the test execution phase.
Which of the following information is useless when the specified exit criteria is evaluated?

  • A. A traceability matrix showing the relationships between the product risk items and the test cases
  • B. A chart, showing the trend in the lag time from defect reporting to resolution, extracted from the defect tracking system
  • C. A list of all the open defects with the associated classification information extracted from the defect tracking system
  • D. The execution status of all the test cases extracted from the test management tool

Answer: B

Explanation:
Section: Testing Process
Explanation/Reference:


NEW QUESTION # 40
You are working on a project to develop an authentication system for an e-commerce website. This system provides two features: Registration and authentication. Two different development teams develop these two features.
There is a high likelihood that the delivery of the authentication feature to the test team will be three weeks later. To complete the registration the user must provide the following registration inputs: Name, surname, birth date, fiscal code and he/she can select a username and a password.
A registered user can be a special user or a normal user. To be identified as a special user, he/she must also provide, during the registration process, a voucher possibly received from the IT department.
Access is granted only if a user is registered and the password is correct: In all other cases access is denied. If the registered user is a special user and the password is wrong, a special warning is shown on the system console.
You are currently performing a quality risk analysis using FMEA.
Based only on the given information, which of the following is NOT a product risk that could be identified during the quality risk analysis?

  • A. The late delivery of the authentication feature to the test team causes delays in the start of test execution and this could result in a shorter test period
  • B. The authentication system grants access to a normal user with a wrong password
  • C. The authentication system grants access to a special user with a wrong password
  • D. The authentication system denies access for a special user with a wrong password, but doesn't display a special warning on the system console

Answer: A

Explanation:
Section: Test Management
Explanation/Reference:


NEW QUESTION # 41
Assume you are a Test Manager involved in system testing of a CRM application for a Pay-TV company.
Currently the application is able to support a proper number of users assuring the required responsiveness.
Since the business is expected to grow, you have been asked to evaluate the ability of the application to grow to support more users while maintaining the same responsiveness.
Which of the following tools would you expect to be the most useful at performing this evaluation?

  • A. Static analysis tools
  • B. Test management tools
  • C. Coverage tools
  • D. Performance tools

Answer: D

Explanation:
Section: Test Tools and Automation
Explanation/Reference:


NEW QUESTION # 42
The following are the requirements identified as "critical":
REQ-SEL-001. The user shall be able to combine all the three products with all the four durations to define an item to purchase
REQ-SEL-002. The user shall be able to add a maximum of six different items to the shopping cart REQ-PUR-001. The user shall be able to purchase all the items in the shopping cart using a credit voucher REQ-PUR-002. The user shall be able to purchase all the items in the shopping cart using the available credit already charged on the smartcard
REQ-PUR-003. The user shall be able to purchase all the items in the shopping cart using all the accepted credit cards (Visa, MasterCard and Great Wall Card)
REG-LOGO-001. The user shall be able to logout (by clicking the logout button) from both the "select" and
"purchase" pages going back to the "browse" page (anonymous navigation) Moreover the following quality risk item has been identified as "critical":
QR-P1. The web customer portal might not be able to provide the expected response time (less than 10 sec) for the purchase transactions under a load of up-to 1000 concurrent users Test analysis for system testing has just begun and the following test conditions have been identified.
TC-SEL-01. Test the combinations of products and durations to define an item to purchase TC-SEL-02. Test the maximum number of items, which can be added to the shopping cart TC-PUR-01. Test the purchase of an item
TC-PUR-02. Test the purchase of an item with the credit charged on the smartcard What is the MINIMUM number of test conditions that must be added to fulfill both the EXCR1 and EXCR2 exit criteria?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 43
Which one of the following metrics to be produced needs traceability between the test
cases and each item in a proper test basis?
K2 1 credit

  • A. Requirements coverage
  • B. Cumulative number of reported defects versus cumulative number of resolved defects
  • C. Mean time between failures for the system
  • D. Trends in the lag time from defect reporting to resolution

Answer: A


NEW QUESTION # 44
You are the Test Manager of a new project that will have three formal levels of testing unit, integration and system testing. The testing strategy you decide to adopt a blend of risk-based testing and reactive testing strategies.
Which of the following answers describes the most consistent example of implementation of this test strategy during the execution of the system tests?

  • A. Your test team executes scripted tests designed and implemented before the execution of the system test phase, to cover the identified product risks. It also performs exploratory testing sessions throughout the system test phase
  • B. Your test team executes exploratory tests following a session-based test management approach throughout the system test phase
  • C. Your test team executes system tests under the guidance of a sample of users throughout the system test phase
  • D. Your test team autonomously performs some exploratory testing sessions and, at the very end of the system testing phase, it also executes more system tests under the guidance of a sample of users

Answer: A

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 45
After the presentation, you are asked to explain the chart.
Assume you have applied a full risk-based testing strategy.

Which of the following answers would you expect to best describe the pie chart?

  • A. 97 percent of the risk items has been tested. No open bugs or test failures remain. Only 3 percent of risk items remains to be covered by the remaining test
  • B. According to the full risk-based testing strategy applied, it is very likely that the highest-risk items, tests and bugs remain in the blue and red areas. Therefore, it is very risky to release the application
  • C. Only the lowest-risk items, tests and bugs should remain in the blue and red areas. Therefore the application can be released at any time subject to management of the items identified in those areas
  • D. All the risk items have been covered with tests. No more risk items remain to test

Answer: C

Explanation:
Section: Improving the Testing Process
Explanation/Reference:


NEW QUESTION # 46
Assume you are managing a test automation project for a mission-critical system.
Because vendor provided tools and open source solutions don't meet the needs of this project, you ask your test team to develop a custom automation framework.
Which of the following management issues associated to the development of this custom automation framework is least likely to manage?

  • A. Proper testing for the custom automation framework must be performed
  • B. The custom automation framework will require an adequate documentation
  • C. The changes to the custom automation framework should be communicated to all external users of this tool under the GNU license
  • D. The custom automation framework will need proper maintenance

Answer: C

Explanation:
Section: Test Tools and Automation
Explanation/Reference:


NEW QUESTION # 47
Which of the following answers describes a factor that may reduce the effort spent when
using distributed test teams without negatively affecting system quality?
K2 1 credit

  • A. With several distributed test teams, two or more teams assume some test conditions are
    covered by their team and their team alone. But all of the teams actually cover them
  • B. With several distributed test teams, every team assumes that some test conditions are
    covered by other teams but actually no one covers them
  • C. Difficulties in communication between the distributed test teams due to time zone
    differences
  • D. With several distributed test teams, all of the distributed test teams use a single unified
    test dashboard

Answer: D


NEW QUESTION # 48
In your organization the following tools of the same vendor are currently in use a requirements management tool, a test management tool and a bug tracking tool.
You are the Test Manager.
You are currently evaluating a test automation tool of the same vendor (to complete the vendor's tool suite) against an interesting open-source test automation tool under the GNU GPL (General Public License).
There are no initial costs associated to that open-source tool.
Which of the following statements associated to the selection of the open-source tool is correct in this scenario?

  • A. There are no initial costs for the open-source tool because open-source tools are usually low-quality, while vendor tools have always a better quality than the corresponding open-source tools
  • B. There are no initial costs for the open-source tool but you should carefully consider the costs associated to the integration with the existing tools and also evaluate the recurring costs
  • C. The open-source tool can be modified but it can't be distributed further in any way
  • D. The open-source tool can be modified but only if the community of developers of that tool gives you the formal permission to modify it

Answer: B

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 49
You are the Test Manager of a new project aimed at developing a software system that must be certified at level B of the DO-178B standard. The project will follow a V-Model software development life cycle and it will have four formal levels of testing: component, integration, system and acceptance testing.
You must produce the test plan documentation for this project by providing an adequate coordination across the four levels of testing in order to assure audit ability.
Which of the following answers would you expect to best describe how to organize the test plan?

  • A. Produce a master test plan that covers three levels (component, integration, system test) and a separate acceptance test plan
  • B. Produce a master test plan describing the relationship between the four levels, and four separate detailed level test plans, one for each level
  • C. Produce four separate detailed level test plans, one for each level, without a master test plan
  • D. Produce a single master test plan that covers in detail all four levels, describing the particular activities for all test levels

Answer: B

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 50
Which of the following statements about management of product quality risks in mature organizations with respect to the lifecycle, is true?

  • A. Mature organizations don't waste time identifying the sources of risks. They only focus on identifying product quality risks
  • B. Mature organizations address product quality risks associated to non-functional characteristics only during the system test phase
  • C. Mature organizations are aware that risk management of product quality risks only occurs during testing
  • D. Mature organizations are aware that the contribution of testing to analysis of product quality risks is very important. The analysis should occur throughout the entire lifecycle

Answer: D

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 51
In the next two months some new features will be constantly added to new releases of a project you are working on as Test Manager.
You have identified as one of the main project risks, that the requirements specification will still be incomplete when your team starts the test design and implementation phase.
Some requirements will most likely be completed too late to allow a proper test preparation.
You and your test team have already worked on several similar past projects in the same organization.
Which one of the following options would you expect to be the most effective at mitigating this risk?

  • A. Don't prepare any test and just run the regression test suite to check that the new features don't introduce regression
  • B. Even if there are only few details missing, escalate the risk to the project manager without preparing any tests
  • C. Make reasonable assumptions about the missing details and design lightweight tests that can be easily updated during test execution
  • D. Don't design any test until the test execution starts, then communicate that test execution is blocked due to incomplete requirements

Answer: C

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 52
Assume that you are the Test Manager for a small banking application development project.
You have decided to adopt a risk-based testing strategy and 5 product risks (R1, R2, R3, R4, and R5) have been identified during the quality risk analysis.
The following table shows the risk level associated to these product risks (higher numbers mean higher risk):

55 test cases have been designed and implemented to cover all these 5 product risks. The coverage is described in a traceability matrix.
This is the test execution status table, after the after the first week of test execution:
About 56% of the planned test cases have been successfully executed.
Assume that no additional product risks have been identified during the first week of test execution.

Which of the following answers would you expect to best describe the residual risks associated with the identified product risks, at the end of the first week of test execution?

  • A. Since R3 is the only risk for which all test cases have passed, the risk has been reduced by 20%
  • B. The test execution status table indicates that the risk has been reduced by 56%
  • C. The residual risk level can't be determined, because it requires that all the test cases have been executed
  • D. The test execution table doesn't give an indication of the risk level of the open defects and the test cases that failed or are not run yet

Answer: D

Explanation:
Explanation/Reference:
Explanation:


NEW QUESTION # 53
Assume that the following test cases have been executed at the end of the first week of
test execution: TC-001, TC-002 and TC-007. All these tests are 'passes'.

What is the MINIMUM number of the remaining test cases that must be successfully
executed to fulfill the EX1 exit criteria?
K3 2 credits

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B


NEW QUESTION # 54
Which of the following factors could negatively influence a review?
K2 1 credit

  • A. Include as many people as possible in order to have more viewpoints about possible
    problems on the item under review
  • B. Include people with the adequate level of knowledge, both technical and procedural
  • C. Include people able to contribute to a clear, thoughtful, constructive and objective
    discussion
  • D. Include people who are detail-oriented and scrupulous at finding issues

Answer: A


NEW QUESTION # 55
......


The ATM certification is offered by the International Software Testing Qualification Board (ISTQB), a non-profit organization that aims to standardize software testing practices globally. The syllabus for the exam is designed according to industry standards, and the certification is recognized worldwide. ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012] certification is an excellent choice for testing professionals seeking to advance their careers in software testing and enhance their knowledge and skills.

 

Real ATM Quesions Pass Certification Exams Easily: https://www.actual4cert.com/ATM-real-questions.html

Practice with these ATM dumps Certification Sample Questions: https://drive.google.com/open?id=1wl1sCVmui_UDjrNuRIUi3N0gF5XRY-VF